Thursday, February 22, 2018

Supersonic Speed - I am ready (almost)

Je suis presque prĂȘt
Graceful styling augmented by winter
If the snow was deeper it would hide the missing grill

I hooked up the fuel lines, the vacuum lines, the throttle linkages and wired up the new coil.





Shiny new solenoid, new spark plugs are in and I figured out the firing order (counterclockwise, don't forget).


Testing time
Did it work? Take a look (thanks to YouTube):  Testing the 226

 With all that success I went ahead and found all the parts to hook up the radiator.

I assumed I would need to clean out the gas tank, but the 1/2 gallon of very old gas I drained out  looked clean. A quick rinse with some fresh gas and it looked like new - just lucky or did Kaiser Frazer get some high quality gas tanks?

Looks fresh out of Willow Run
Radiator and gas tank hooked up - it's time for another test (more YouTube): Leaky water pump test run

A new water pump is on its way and I'm putting together an exhaust system. Fixing the clutch pedal and cleaning up the driveshaft... what else am I missing (who needs brakes)?

It's still Winter here - let's go on a walk!